MN Stripes logo

Highlight Your Parking lot, Enhance Your Brand

FAQs

MN Stripes inc.

Have a line striping-related question? We have the answer.

Check out these FAQs and contact us today for more information!

  • How long does asphalt line striping take to dry?

    The drying time for asphalt line striping typically ranges from 30 minutes to one hour before it's ready for traffic. This duration can vary based on weather conditions and the specific type of paint used in the application.
  • How often should parking lot lines be repainted?

    Parking lot lines generally require repainting every one to three years. The frequency depends on factors such as the volume of traffic, local weather conditions, and the quality of paint initially used.
  • What type of paint is used for asphalt line striping?

    For asphalt line striping, several paint types are commonly used, including water-based acrylic, oil-based, and thermoplastic paints. These options offer durability and high visibility. However, oil-based paint is often considered the most cost-effective choice for many applications.
Share by: